In 1964, the Council of the Institution of Civil Engineers set up a Committee under theChairmanship of T. A. L. (now Sir Angus) Paton, CMG, BSc(Eng), FICE, to proposerevisions to the Standard Method of Measurement of Civil Engineering Quantities. In M3 A quantity shall be givenagainst all items for specifiedrequirements of which the valueis to be ascertained anddetermined by admeasurement.A unit of measurement shall bestated for each such item.

A11 Item descriptions fordisposal of controlled andhazardous materials shall statethe nature of the material. The challenge of updating references to technical standards had been identified, and isincreased by the use of CESMM in other countries which have their own national M2 An item may be given for aParent Company Guaranteewhere it is envisaged a tenderermay be a subsidiary of a largercompany or group. A1 The location and limits ofexcavation by dredging shall bestated in item descriptionswhere its extent wouldotherwise be uncertain.

Who wrote this?

Definition rules 3.7. Definition rules in the Work Classification define the extent and limits of the classof work represented by a word or expression used in the Work Classification and in aBill of Quantities prepared in accordance with CESMM4.

M7 The volume measured forexcavation below a body ofopen water shall be the volumebelow water when the watersurface is at the level (or thehigher level of fluctuation ifapplicable) shown on thedrawing to which reference isgiven in the Preamble inaccordance with paragraph 5.20. Whilst every care has been taken in the preparation of this document, neither the Institution of CivilEngineers nor the Civil Engineering Contractors Association nor any of their committees can acceptany liability for any loss or damage which may be suffered by any person or organisation as a result ofits use. there is a variety of contracts for civil engineering including NEC and the InfrastructureConditions of Contract (formerly known as the ICE Conditions of Contract).Additionally some Clients have adopted standard forms produced by other engineeringinstitutions, and large projects are sometimes let on bespoke contracts drawn up by

Do not print this page

The unit of measurement for each item shall be that stated for the item in theWork Classification. The unit of measurement stated against a descriptive feature inthe Work Classification shall apply to all items to which that descriptive featureapplies. A13 Where differentcompaction requirements arespecified for the same fillingmaterial they shall be stated initem descriptions for filling. notes in the work classification and the introduction of a standard method ofmeasurement for sewer renovation work. The rearrangement of the former notes isintended to make the document easier to use in two ways. Firstly, the notes have been A22 Item descriptions forCalifornia bearing ratio testsshall state the compactive effort,surcharge and whether soakingis required. J. K. Banyard OBE, FREng, FCGI, BSc(Eng), FICE, FCIWEMR. Beales, Barrister at LawW. Edwards BSc, Dip Arb, FICE, FCIHT, MCInstCES, FCIArb

A6 Item descriptions for thenumber of rotary drilledboreholes shall state thosewhich are continuations of lightcable percussion boreholes. A20 Item descriptions forconsolidated triaxial tests shallstate the diameter and theeffective pressures. Multistagetests shall be identified in itemdescriptions. C1 Items for work in this classshall be deemed to includedisposal of excavated material andremoval of dead services. The opportunity has also been taken to update a number of other areas, and deal with afew known problems that have emerged over the years. Provisional Sums for work executed on a daywork basis may be given comprisingseparate items for labour, materials, plant and other charges. Where a Daywork Scheduleof the form stated in sub-paragraph (b) of paragraph 5.7 is used each Provisional Sumshall be followed by an item for the adjustment referred to in that sub-paragraph. Theprice inserted against each such item shall be calculated by applying the percentageaddition or deduction inserted by the contractor in the Daywork Schedule to theamount of the associated Provisional Sum.

Instrumental observations 1 Pressure head 1 Standpipes m2 Piezometers m3 Install covers nr4 Readings nr M18 Additional fillingnecessitated by settlement of orpenetration into underlyingmaterial shall be measured onlyto the extent that its depthexceeds 75 mm. M13 The lengths of tendons forground anchorages shall bemeasured between the outerends of anchorages Where a feature of an item is not listed in the Work Classification the digit 9 shallbe used in the appropriate positions in the code number. than there was when CESMM was first published, two major changes to this 4thEdition of CESMM have been introduced: